Commissioning

Commissioning for high performance

After installation, our specialists handle all critical issues and to make sure that both the equipment and the process operate according to expectations.

How it works

Our experts:

  • Do test runs and performance checks
  • Train operators
  • Manage the operation handover, documented by an acceptance certificate
  • Conduct follow-up visit to verify system performance
commissioning 640x360

How can we help you?

How can we help you?Please contact us with any queries or questions:

Call 24/7 Service +1 888 253 2226
Email canada.parts@alfalaval.com

Ten Top Tips to Keep your Plate Heat Exchanger in Tip Top Condition

 

1. Make sure that the operating conditions (temperatures and flow rates) comply with the design specifications.

2. At start-up, vent the heat exchanger but open and close the valves slowly to avoid pressure surges and water hammer.

3. Use upstream filters and strainers to remove particulate fouling and protect the heat exchanger.

4. On a daily basis check for any changes in temperature or pressure and check for any signs of external leaks.

5. On a regular basis keep the tightening bolts clean and well-lubricated.

6. Use Performance Audit to avoid having to open the plate heat exchanger for inspection.

7. Use Cleaning-In-Place (CIP) to avoid the need to open the heat exchanger for cleaning.

8. Always keep stand-by units clean and dry. If a heat exchanger is taken out of service, flush with fresh water and drain it completely.

9. Protect heat exchangers from water splash and rain. Avoid exposure to ultra violet rays and ozone typically generated from electrical sources.

10. Only use genuine spare parts for guaranteed performance, reliability and equipment life. Maintain a stock of essential spare parts and follow the storage instructions.

Learn more about keeping your Alfa Laval equipment in top condition.

Part of Alfa Laval Start-up Services